# Tasks ## 1. Presentation and documentation - [x] 1.1 Filter childless venues and retain their wallet-level read status; verify empty, funded Cross, unknown/failed and returning-position cases in the standalone preview while preserving unrelated tree state. - [x] 1.2 Update the overview specification and relevant project/shared documentation; verify obsolete visible-empty-group claims are removed and links remain valid. ## 2. Integrated verification - [x] 2.1 Run the normal Gradle build and strict validation for the change and affected spec; record the preview/build results. - [x] 2.2 Inspect the final diffs and confirm existing unrelated changes, integration behavior and the no-commit/no-push constraint are preserved.